The original lifts (elevators) to the first and second floors were provided by two companies. Both companies had to overcome many technical obstacles as neither company (or indeed any company) had experience with installing lifts climbing to such heights with large loads. The slanting tracks with changing angles further complicated the problems. The East and West lifts were supplied by the French company Roux Combaluzier Lepape, using hydraulically powered chains and rollers. The North and South lifts were provided by the American company Otis using car designs similar to the original installation but using an improved hydraulic and cable scheme. The French lifts had a very poor performance and were replaced with the current installations in 1897 (West Pillar) and 1899 (East Pillar) by Fives-Lille using an improved hydraulic and rope scheme. Both of the original installations operated broadly on the principle of the Fives-Lille lifts.[48][49]
The Fives-Lille lifts from ground level to the first and second levels are operated by cables and pulleys driven by massive water-powered pistons. The hydraulic scheme was somewhat unusual for the time in that it included three large counterweights of 200 tonnes each sitting on top of hydraulic rams which doubled up as accumulators for the water. As the lifts ascend the inclined arc of the pillars, the angle of ascent changes. The two lift cabs are kept more or less level and indeed are level at the landings. The cab floors do take on a slight angle at times between landings.