Dear Sirs,
Please note landscape designer site visit confirmed arrange on Monday 20/7/2015 start time 1.00 pm.Key issue as below.
· As built drawing of Tree.
· Inspection to all Tree as installed.
· Overall of works for external area.
· Spirit house location.
- Size change from the design to 2.50x2.50 with finishing.
- Mark up location require and make leveling as foundation/step to shown combine to other works (around the area).
- Target spirit ceremony setting up at 14 or 26 August 2015.
Please ensure and follow up as above from NOW on.
Best Regards
Chainarong
081-9952539