I suggest you do not run schedule 10 or modify it to EXCLUDE the generations you do not want to be run on that day.
Schedule 10 by default includes all generations because there was no selection at all.
If there are no parameter selction run ids then, the system will generate all generations. You must select which generations you want to run for schedule 10.
You should decide if you want to run schedule 10 at all. Perhaps it is not necessary to run.
If you schedule a generation id to run in two separate shceules in one day it will run two times.
Because you did not select ANY run parameters for schedule 10 the system will run all generation ids.
You could modify schedule 10 to ‘exclude’ the generation ids that you do not want to run.
You must do this in the parameter selection form of the schedule 10.
In the screenshot below the generations to run are set as ‘INCLUDE’.
To o exclude the generations you do not want on schedule 10, select the ‘EXCLUDE’ button and then enter the list of generations you do not want to run on schedule 10.