For the case of AP survey in Siam Paragon, new APs are required to install for improvement. The location has already been fixed according to the simulation result. Next step, we have to assign an engineer with Chanel’s design team for site survey about the cabling job in order to confirm the APs are able to installed at the planned location and connect back to the switch. Can you arrange an engineer going to Siam Paragon next week?