Abstract.The aim of this study is to assess the groundwater balance in the Yom basin by the
MODFLOW model. The Yom basin is one of the main basins in Thailand that has no dams or
reservoirs for collecting surface waters. Therefore, the general agriculture practice is using water
from rainfall, pond or groundwater resources. Groundwater has been used too much especially in
low land areas for agriculture and water supply. There are two sub-groundwater basins within the
Yom basin. They are the Phare and upper Chao Phraya groundwater basin.The simulation area of
Phare and upper Chao Phraya groundwater basins are 10572 and 13046 square kilometers
respectively. The model design for both groundwater basins a utilized 1000 meters grid spacing and
five layers of ground level (gravel, sand, clay and flint). Parameters of model are recharge rate,
groundwater uses, water surface and aquifer hydraulic parameters. As a result, total groundwater of
Phare groundwater basin is 440 million cubic meters and total groundwater of upper Chao Phraya
groundwater basin is 517 million cubic meters. Total groundwater of Yom basin is 957million cubic
meters and there is groundwater storage within the Yom basin of about 14688 cubic meters.
Groundwater simulation can be utilized to provide information for water resource management in
the future.
Abstract.The aim of this study is to assess the groundwater balance in the Yom basin by theMODFLOW model. The Yom basin is one of the main basins in Thailand that has no dams orreservoirs for collecting surface waters. Therefore, the general agriculture practice is using waterfrom rainfall, pond or groundwater resources. Groundwater has been used too much especially inlow land areas for agriculture and water supply. There are two sub-groundwater basins within theYom basin. They are the Phare and upper Chao Phraya groundwater basin.The simulation area ofPhare and upper Chao Phraya groundwater basins are 10572 and 13046 square kilometersrespectively. The model design for both groundwater basins a utilized 1000 meters grid spacing andfive layers of ground level (gravel, sand, clay and flint). Parameters of model are recharge rate,groundwater uses, water surface and aquifer hydraulic parameters. As a result, total groundwater ofPhare groundwater basin is 440 million cubic meters and total groundwater of upper Chao Phrayagroundwater basin is 517 million cubic meters. Total groundwater of Yom basin is 957million cubicmeters and there is groundwater storage within the Yom basin of about 14688 cubic meters.Groundwater simulation can be utilized to provide information for water resource management inthe future.
การแปล กรุณารอสักครู่..

จุดมุ่งหมายของการศึกษาครั้งนี้ Abstract.The คือการประเมินความสมดุลของดินในลุ่มน้ำยมโดย
รูปแบบ MODFLOW ลุ่มน้ำยมเป็นหนึ่งในอ่างหลักในประเทศไทยที่มีเขื่อนหรือ
อ่างเก็บน้ำในการเก็บรวบรวมน้ำผิวดิน ดังนั้นการปฏิบัติทางการเกษตรทั่วไปจะใช้น้ำ
จากบ่อปริมาณน้ำฝนหรือน้ำบาดาลทรัพยากร น้ำบาดาลที่มีการใช้มากเกินไปโดยเฉพาะอย่างยิ่งใน
พื้นที่ต่ำที่ดินเพื่อการเกษตรและน้ำประปา มีสองแอ่งย่อยน้ำใต้ดินภายในเป็น
ลุ่มน้ำยม พวกเขาจะแพร่และเจ้าบนพื้นที่จำลองพระยาน้ำใต้ดิน basin.The ของ
Phare และเจ้าพระยาตอนบนแอ่งน้ำบาดาลเป็น 10,572 และ 13,046 ตารางกิโลเมตร
ตามลำดับ การออกแบบรูปแบบสำหรับทั้งแอ่งน้ำบาดาลใช้ 1,000 เมตรระยะห่างตารางและ
ห้าชั้นของระดับพื้นดิน (กรวดทรายดินเหนียวและหิน) พารามิเตอร์ของแบบจำลองมีอัตราการเติม
ใช้ดินพื้นน้ำและน้ำแข็งพารามิเตอร์ไฮดรอลิ เป็นผลให้น้ำบาดาลรวมของ
แอ่งน้ำใต้ดินแพร่ 440 ล้านลูกบาศก์เมตรและน้ำใต้ดินรวมของบนเจ้าพระยา
อ่างน้ำบาดาลเป็น 517,000,000 ลูกบาศก์เมตร น้ำใต้ดินรวมของลุ่มน้ำยมเป็น 957million ลูกบาศก์
เมตรและมีการจัดเก็บน้ำใต้ดินภายในลุ่มน้ำยมประมาณ 14,688 ลูกบาศก์เมตร.
จำลองน้ำบาดาลสามารถนำไปใช้เพื่อให้ข้อมูลในการบริหารจัดการทรัพยากรน้ำใน
อนาคต
การแปล กรุณารอสักครู่..
