Identifying the correct design method in this complex environment was a difficult task both for the hospital and later for an outside vendor that was hired to develop the system. At the time the Fig. 2. The archive room at SN. study was conducted the iterative design and implementation of the EMR system was still ongoing and had taken place over an
8 year period.