(6) Temporary and permanent easement
(7) Other
C. Proposed finished profile (using combinations of different wall types along the
wall alignment may be the optimal solution)
(1) Limit of radius of wall horizontal alignment
(2) Cut or fill with respect to original slope
(3) Minimal site disturbance:
(a) Anchored wall with minimal cut
(b) Stepped-back wall on terrace profile
(c) Superimposed or stacked low walls
(d) Mechanically stabilized earth (MSE) wall with truncated base or
trapezoidal reinforced zone
D. Check available space versus required dimensions
(1) Working space in front of wall (shoring, formwork, etc.)
(2) Wall base dimension
(3) Wall embedment depth
(4) Excavation behind wall
(5) Underground easement
(6) Wall front face battering
(7) Superimposed walls or trapezoidal profile of wall back