2. Support for the MHS Project asset check-list
Assisted in preparing for equipment checklist.
Performed monthly inspection of project assets.
3. Preparation for field survey to Ban Pai Wieng Nua on 27-29 January 2015
Assisted in preparing for the field survey documents.
Prepared for equipment and transportation for field survey.