Emergency Preparedness document is in place.
The awareness amongst employees and key personnel involved in emergency handling operation has been checked to evaluate level of emergency preparedness and found encouraging.
So far ‘Mock Drills’ have been carried out.
The communication system in TCR is by land line phone, mobile telephone. Sirens are available. The safe assembly points are located as marked on layout
During the safety audit period a mock drill was conducted involving external fire brigade from Angthong province. Our observation indicates that it took longer time for external fire brigade to arrive at factory location.
Major observations are;
a) Emergency plan is updated on yearly basis.