7. Preparation policy
(1) The control plan shall be consistent with the necessary contents of the following documents:
(a) Production drawings/ Technical specifications
(b) Customer approved product specifications
(c) Design/ Process FMEA
(d) Process design sheet (SASG: L11-01A)
(