On behalf of the Employer, Thai Paragon Construction Co., Ltd. are hereby instructed to construct the Cool water pump room at floor 7 zone 2 as details sown on the Approved RFA No. TPC/LS/935/2016 Re.01 dated 22-1-16 and RFA No. TPC/LS/943/2015 dated 11-02-16