5) Placing an order
Select a manufacturer and place an order considering delivery date, installation time, and
installation cost.
6) Incoming of elements
(1) Preparation before incoming of elements
① Secure installation place and utilities
② Secure tools such as a forklist for loading and unloading
(2) While incoming
① Check the quotation and the purchase order
7) Installation and performance verification
(1) Check operation and performance of elements
8) Control of element history (2) Check element dimensions
The managing department controls the element history by recording history of repairs (3) Return the elements when a problem occurs after installation.
and replacements.
6. Related Standards
1) Control of Record Procedure (BSPTH-02)
2) Control of Document Procedure (BSPTH-01)