As the density and speed of sound of CNG are
much less than for gasoline, the minimum opening
times of the GDI injector are small enough to deliver
the right amount of CNG in the pre-chamber.
This solution has already been adopted in many prototypes
of jet ignition pre-chamber for engine tests.
The engine assembly is shown in Fig. 7.