Segmentation machine 9, dosage machine 10 and pneumatic separation equipment 12-15 compose a single line. It consists of a frame where the segmentation machine is placed. Above it is the loading bunker, ventilation shaft, and cyclone and control panel. Ventilation shaft, cyclone and dust container are connected.