Prior to starting work on the machine or equipment that has been locked out/ tagged out, the
authorized employee(s) shall verify that isolation and de-energization has been accomplished in
accordance with sections 5.5 through 5.8 above. Acceptable methods of verification of isolation
include:
A. Operating the machine or equipment controls to determine that the energy isolation was
effective.