Reference is made to UN-SH-CH JV’s Letter ref. No. USC/C2/PCGRN/215/0004 dated Oct 14, 2016, regarding Cost Saving Proposal to Replace Exterior C-Girder by I-Girder at Highway Bridges BL2-HW2, BL-2HW1A & BL2-HW1B and at Ramps N24 KK-1, N24 KK-2 & N23 PY.
After having reviewed, PCGRN have no objection on the calculation report done by the independent designer (NorCiv Engineering Co., Ltd.). However, UN-SH-CH JV has to submit the redesign drawings of I-Girder type I-3 as noted by the independent designer (change Bar Mark G4, G5 and G6 from DB12@125 to DB12@100) and revise all the relevant drawings, with initial of the independent designer.
Your request for this change, the responsibility of redesign works, design fee and all other impact which may be occurred shall be borne by the Contractor.
เมื่อมีการ un-sh-ch คอนของจดหมายเลขอ้างอิง USC / C2 / pcgrn / 215 / จดจําลงวันที่ 14 ต.ค. 2559 , เกี่ยวกับการประหยัดค่าใช้จ่ายข้อเสนอแทน c-girder ภายนอกโดย i-girder ที่สะพานทางหลวง bl2-hw2 bl-2hw1a & , bl2-hw1b และทางลาด kk-1 ตลอด 24 ตลอด 24 , kk-2 & n23 PY .หลังจากทบทวน pcgrn ไม่คัดค้านในการคำนวณรายงานที่ทำโดยนักออกแบบอิสระ ( norciv Engineering Co . , Ltd . ) อย่างไรก็ตาม un-sh-ch JV ได้ยื่นแบบวาดประเภท i-girder i-3 ตามที่ระบุไว้โดยนักออกแบบอิสระ ( เปลี่ยนแถบเครื่องหมาย G4 , G5 G6 และจาก db12 @ 125 เพื่อ db12 @ 100 ) และการแก้ไขทั้งหมดที่เกี่ยวข้องรูปวาด กับเริ่มต้นของนักออกแบบอิสระคำขอของคุณสำหรับการเปลี่ยนแปลงนี้ ความรับผิดชอบในงานออกแบบ , ค่าออกแบบและผลกระทบอื่น ๆทั้งหมดที่อาจจะเกิดขึ้นจะเป็นพาหะโดยผู้รับเหมา
การแปล กรุณารอสักครู่..