Progress Update: The service outage occurred due to a fiber cut. The OFC 60, 144 cores cable was severed as the result of an accident that brought down the utility poles far away from Preedee 34 site about 2.31 kilometers around Expressway entrance Pattanakarn Soi 10. Currently, the field engineer is fixing the issues. The ETR is 2 hrs.