The digestion was a batch process and 6 kg each of pre-fermented
Lemon grass, Cow dung and Poultry droppings was respectively
mixed with water to form slurry in the ratio 1:1 by volume
and introduced into Reactor A, B and C respectively through an inlet
pipe of 50 mmat the top of each reactor.