Latest Position : Employees control to machinery
- Commissioning plant and Start up plan Production
- Job operating and production control Machine check sample QC
- job mechanism Control check equipment that is ready to use and modify the devices the initial work page Such as pumps,Valves, systems are used in conjunction to the motor production
- Administrative waste water to flow through the boiler section
- Administrator joined aircon and cooling water used in the production