Periodic maintenance is carried out every 3 years (MV/MV substation) and once a year (HV/MV substation), thus on average a relay can have a defect for 1.5 or 0.5 years before it is detected. When in this period a fault will occur, it will result in failure of the protection and disconnection of a larger area or damage to a MV/MV substation