Our inspector went to check the stone for mdb room today. He reported back that it would take another 20 days to finish the material preparation. We actually require the installation to be finished before 15 September before the mdb and generator arrived. So the material preparation shall be finished with in a week. Please provide us an assistance to increase manpower and expedite this work.
Sam