c) For 3rd Runway AFL 02R and AFL 20L buildings, each CCTV switch shall be crossconnected to existing Airport CCTV switches Routers respectively in existing NODE 6 (PPW) and NODE 7 (CFZ) through two GE links each (GE SFP modules to be provided by Contractor at both ends) respectively supported by two different cables installed in one single pathway.d) All the network devices shall support a protocol, to offer a network resiliency delay under 100ms in the event of network device or link failure.