The preliminary we coordinate with the contractor who will perform extracting the floor in order to find the additional leakage point and find the way to repair. The contractor will extract of floor in the Electrical Meter Room on 3rd Floor on September 24, 2013 at 10.00 a.m. – 05.00 p.m., while the work may be noisy intermittently.