Currisa Plains: In 1984, a 6.5 MW single crystal silicon PV plant was installed about 85 km east of San Luis Obispo, Califomia. This system was also privately financed and built by ARCO Solar, Inc. The plant is divided into 10 segments. Each of the first nine have 84 two-axis trackers; the modules in these