Kindly note that we will be arranging for a router and switch installation for the ADCN network on the 28th Dec (Wednesday) at 4pm local time at the Songkhla CLS. I will share the FE details soon.
Please help to clear his access if necessary and ensure that AC power and rack space at the NEC rack.