envisions boosting the processing capacity to a maximum of 90,000t/d (averaging 75,600t/d) while maintaining throughput capacity at 320,000t/d via the deepening and expansion of the current open pit, as well as the expansion of dump sites and construction of a new 600Mt tailings dam.