Is a rule for product acceptance and inspection established?
Does a inspector (registered inspector if being performed outside of Procurement Department) sign or stamp the inspection document as evidence? Is account payable recorded based on such inspection document signed or stamped?
(For HTS Subsidiaries)
Is an acceptance validation slip and delivery order always signed/stamped on the receiving slip by inspector?