In order to have the design of the micro hydro power there is a need to fix the position of the power house where the proposed power station is to be situated. The power house
was proposed to be located in an area 60 m away from the reservoir. The next task in the process was to calculate the head difference between the turbine and the available head of the reservoir. Using the GPS technology the head of the reservoir was calculated and was found to be 26 m. The length of the penstock required is 55 m.