1. Calculate the overhead rate for Grinding based on machine hours and the overhead rates for Assembly based on direct labor hours.
2. Using the overhead rated calculated in Requirement 1, calculate the cost of Job 189.
3. What if Job 189 had required five machine hours in Grinding and 20 direct labor hours in Assembly? Direct labor and direct materials cost remained the same Calculate the new cost of Job 189.