Nevertheless and regardless of the verification that in cooperative mode this is possible to address the manifestations of the contradictions, it turns out that there are situations where this is not possible. Weidentified two situations: the first was the inability to follow, in an effective way, the change of focus in the infrastructure testing, due to changes made in the client’s infrastructure and the other consisted in keeping the tests on the scope and duration agreed.