There are endless deck configurations which can be
accommodated for cable deployment. The most
critical is deck length for separation of the machines
from the cable tanks and the vessel stern chute.
There must be sufficient deck length to provide for
cable minimum bend diameter between the cable tank
and machine. Room is also required for fitting of
cable stoppers or other rigging to the cable aft of the