8.2 Make any necessary provisions so that the temperature
of the condenser bath and the receiving cylinder will be
maintained at the required temperatures. The receiving cylinder
shall be in a bath such that either the liquid level is at least
as high as the 100-mL mark or the entire receiving cylinder is
surrounded by an air circulation chamber.