Therefore we have a relation between the size of the catchment (surface S in ha) and the temporal resolution required (Dt in min), based on Eqs. (1) and (2):
Therefore we have a relation between the size of the catchment (surface S in ha) and the temporal resolution required (Dt in min), based on Eqs. (1) and (2):