This required the containers to be built with the lifting points on their lower sides but the lifting frame could be used with any crane capable of handling the two-cable lift. Where a travelling gantry crane was used this was fine, where a fixed gantry was used however the grappler arms had to be swung out of the way as the frame was manoeuvred over the container