The Master controller verifies that the analysis is configured correctly before it is sent to the oven.
If it is not correct the PGC5000 informs you of the error and the associated analysis.
If the step table contains multiple analysis entries the next analysis will be checked and if found to be OK will be sent to the oven. The schedule does not stop, but steps to the next valid analysis in the step table and runs it.
If all active entries in the step table are determined to be “bad” the schedule stops.