Joint System supplied should be installed on a level surface within the block out. The top of the Joint System should coincide with the finished height of the flooring. This may require additional leveling compound to lift the tops of the frames. Leveling compound must form a continuous bearing/bed for the joint frame. Adjust the leveling of architectural joint system by placing Non-shrink grout.