It composed of manual cutting and mechanical loading cost. The cost elements of the manual cane cutting include: labor collection and transport; cane cutting labor wages; cutting knife and file; accommodation; medicine and incentives. The average labor cost/man/day was found to be 18.47 SDG of which 74% (13.699 SDG) for cane cutting labor wage.