Based on CTQs and data gathering a plan partially synthesized in table 3 was settled and the project sample
sigma levels were calculated (see table 4) indicating that technical execution was the CTQ who presented the
lowest sigma level followed by the project duration indicating that they would be the major variables to be
improved.