Built in defects by Serrano needs to achieve as CMC comments;
*Check list and number of defects not good condition, needs additional 1 team for L 15-17 prior CRM.Inspection stage and 2 team at L27-28.
*Method of rectify defects and accept the quality require.
-Kitchens counter defects and scratch mark defects at mirror.
*3 Teams required from Serrano as per CMC site memo out.