GENERAL TERMS AND CONDmONS OF ORDER
DOC NO. TTCL-GTC-001 WO
1- GENERAL TERMS AND CONDITIONS
1.1 DEFINtTIONS
(1) "CUENT'means TTCL's client named as such in the CONTRACT/
PURCHASE ORDER and includes its representatives.
(2) "TTCL" means TTCL Public Company Limited and includes its personal,
representatives, its successors and permitted assigns.
(3) "CONTRACTOR" means the contractor named as such in the CONTRACT
AGREEMENT or PURCHASE ORDER and includes its personal re|Dresentatives,
its successors and permitted assigns.
(4) "NOTICE OF INTENT" means TTCL's notice to the CONTRACTOli confinning
TTCL's intent of awarding the CONTRACT to the CONTRACTOR.
(5) "SITE" means the place or places so designated by TTCL for the constmction of the
PLANT, including such place or places adjacent thereto which are foi* storage and
assemblage of equipment and materials.
(6) "WORKS" means collectively all the supply, works and services to be undertaken
and performed by the CONTRACTOR in accordance with the construction of the
PERMANENT WORKS being part of the PLANT.
(7) "PERMANENT WORKS" means ail buildings, structures, equipment, materials,
supplies and other things of a pemanent nature to be designated by TTCL, which
arc to be or shall have been built, erected, installed or otherwise completed by the
CONTRACTOR under the CONTRACT/PURCHASE ORDER.
(8) "TEMPORARY WORKS" means all facilities such as buildingfi, structures,
scaffolding, materials, roads work areas, storage areas, unloading pier or jetty of a
temporary nature not to form part of the PERMANENT WORKS, all of which are
required to complete the WORKS. The TEMPORARY WORKS does not include
the CONSTRUCTION EQUIPMENT.
(9) "CONSTRUCTION EQUIPMENT" means all construction equipment, apparatus,
tools and machinery, appliances or things whatsoever nature required for the
performance of the WORKS, and all of which, shall be provided by the
CONTRACTOR unless otherwise specified in the CONTRACT/PURCHASE
A1 lACHMENT B
PO.NO.I)182-fi4eeflft-P0000003 #
ORDER. The CONSTRUCTION EQUIPMENT does not include such materials or
other things which are to form part of the PERMANENT WORKS.
(10) "COMPLETION OF WORKS" means the state as specified in Clause 4.2
"COMPLETION OF WORKS" hereof.
(11) "FINAL ACCEPTANCE OF WORKS" means the final acceptance by TTCL of the
PERMANENT WORKS, pursuant to Clause 4.3 FINAL ACCEPTANCE OF
WORKS hereof
(12) "CONTRACT PRICE" means the compensation to be paid to the CONTRACTOR in
accordance with the CONTRACT/PURCHASE ORDER.
(13) - "TECHNICAL DOCUMENTS" means the drawings, data, specifications and other
technical documents and any modifications thereof or additions thereto as may from
time to lime be furnished or approved by TTCL in writing.
(14) "WORK STANDARDS" means all applicable codes and standards required for the
performance of the WORKS.
(15) "DAY" means a calendar day of the Gregorian Calendar, "week" means seven (7)
successive calendar days and "month" means any calendar month according to the
said Calendar and, when used for the purpose of calculating a period of time, the
next month if such exists, or if not, to the end of the last day of the next month.
APPROVAl, BY TTCL
(1) TTCL shall at all times has the right to approve or the change, modify or reject in
whole or in part to such extent and in such manner as TTCL may consider
reasonable, such documents, specifications, drawings, plans and schedules for the
WORKS, procedures, subcontracts, purchase orders and others which are so
stipulated herein or in other CONTRACT DOCUMENTS to be requiring TTCL's
approval, and such matters as TTCL may consider important and necessary for
proper and smooth performance by the CONTRACTOR of the WORKS.
The CONTRACTOR shall in such manner and at such times as may be stipulated
herein or in other CONTRACT DOCUMENTS submit to TTCL any and all such
documents, etc. as aforementioned.
(2) TTCL's approval or reasonable change, modification or rejection as aforementioned
shall not relieve the CONTRACTOR from his liabilities and obligations under the
CONTRACT/PURCHASE ORDER. TTCL shall assume no responsibilities
whatsoever for the consequences that may result therefrom. The CONTRACTOR
shall not be in any way entitled to claim to TTCL by reason of such change,
modification or rejection reasonably made by TTCL.
DOC NO. TTCL-GTC-001 WO_Date May 11,2015
เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,เราต้องต่อสู้กับ gyeongmo
เปลี่ยนต่อ คิม ,
การแปล กรุณารอสักครู่..
