1. The correct material pallet was moved location but didn't update location change to EDI system
2. The physical operation check has done carelessly, only glanced at the lot number. 5 digits is similar
3. The checker, who was accountable for picking material skipping EDI scanning process
4. Final check didn't operate as normal due to the shipment was finished preparing in night time.