1. Change the piping from the straight type to a spiral type, so as not to crawl on the floor. (by 3/7)
2. Use a dedicated truck to unload the jig without taking an unnatural posture. (currently has been considering a truck)
3. Examine danger points about all work places, and carry out countermeasures, instructions and educations. (by 3/7)