The direct material costs of 6000 for the 50 wool blazers (work order 423) and 3000 for the 100 polyester blazers (work order 424) are specifically identified with each order, as in job costing. The basic point of operation costing is this: operation unit costs are assumed to be the same regardless of the work order, but direct material costs vary across orders when the materials for each work order vary.