The bolts and screws for fixing the machines on the floor will be supplied by
customer according to Rosendahl’s recommendation.
The industrial floor from concrete must assure a floor loading of at least
2000 kg/m² and must not exceed an unevenness of ± 1 cm on the whole size of
the hall (length x width). The interstice of the concrete slabs may never be
between the fixing points of a machine or a machine group, i.e. each machine
or fix connected machine group (e.g. Extruder unit with extrusion crosshead)
must be attached to a contiguous concrete slab