The plate temperature was slowly
increased by 0.3 C min1 from ambient to drying temperature
(103 C) until complete stabilization of the mass of the boards. After
this period, the plate’s temperature was increased by 0.3 C min1
from 103 C to 170 C and the temperature maintained for 2 h.