An irreplaceable Fender Stratocaster has to get from London to Los Angeles on time for an open-air concert. An urgently needed turbine has to get from Munich to Seoul as soon as possible in order to prevent a production shutdown. In both cases, time and a lot of money are at stake. And in both cases, the answer is td.Flash by Lufthansa Cargo.