Khun Banjong, F-Bldg. 2fl. inspection items as;-
LAPIS requests to inculde items below for checkin existing AHU
[A] stop AHU
1) condition of existing cooling coil (scale, dust)
2) condition of casing inside AHU (scale, rust)
[B] run AHU
1) cooling coil capacity
CS/CR temp, flow rate (by ultrasonic ?)
compare capacity with existing design capacity
[C] Renovation
1) check inside piping by camera
Schedule will be informed later.