and distribution personnel and a conference call at 5:15 p.m. on
14 August to determine initial actions. After assessing the state
of the transmission system and identifying the affected area,
all of the breakers within that area were opened as preparation
for restoration. The 138-kV network was restored by 7:25 p.m.
Subsequently, the remaining 46-kV lines and customer load
were restored; this work was completed by 10:05 p.m.