Prepare the document, drawing and calculation design for onshore fabrication and offshore work (foundation check report, construction support calculation, fabrication procedure, heavy lifting procedure, load out procedure, work instruction, etc)
• Monitor fabrication, erection, weighing and loading out operation on site.
• Planned and procure material for fabrication support and sea fastening.
• Prepare the plan and coordinate with all section for heavy lifting, weighing and loading out operation.
• Conduct the JSA meeting for heavy lifting, weighing and loading out operation.
• Monitor Sea-fastening fabrication and coordinate with Marine warranty surveyor (3rd party) to inspect and repair the sea-fastening work before sail away.
• Coordinate with all concern section to follow the schedule.