Standpipe piezometers were installed after drilling to the final depth in every borehole at the dam and appurtenant structures. The method of standpipe installation was in general accordance with the procedure outlined in BS 5930. Groundwater levels in the boreholes were monitored and recorded upon completion of standpipe piezometer installation.